The piston ring installation steps (Dieselpartsworld) 2016-02-28
The piston ring installation steps
Three, the opening of the free expansion limit
When installed, the opening eight times expansion can not exceed the thickness, otherwise more than ring design stress, so that the piston ring is in danger of breaking or deformation. Do not hand close the opening, in order to avoid deformation.
Four, before the ban on processing opening
Piston ring is as a precision machining of parts made of, any processing opening, change the ring of the curve shape, light leakage caused by and by an increase in the opening gap, may lead to the decrease of the oil and gas leakage and pressure and so on. (Figure)
Five, the oil scraper ring installation
(1) three piece steel scraper ring
First elastic lining ring is arranged in the oil scraper ring in the ring groove and the lining ring end completely docking, again under the liner ring end completely docking state is pressed by a thumb, the scraping ring opening and the lining ring end left shifted by 90 DEG, into the whole week. The scraping ring openings such as shown in the figure, and the lining ring to the right at the end of the staggered 90 degrees into the lower scraping ring, assembly inspection of piston ring in the circumferential direction can rotate flexibly, the overall oil combination position loop as shown in figure.
(2) the oil scraper ring with helical spring
Spiral lining ring interface, the volume in the first oil scraper ring groove and the lining spring connected together at both ends, will eventually the oil scraper ring body mounted to lining spiral spring.
When the oil scraper ring incision must be in the opposite lining spring interface. |
|