E-mail : Sale@dieselpartsworld.com | WhatsApp : +86 13850261121

   
    English Spanish Russian french Portuguese Polish Italian German Turkey Arabic    
    English Español Русский Français Português Polski Italiano Deutsch Türkçe العربية    
    Home About us Products News Contact us F.A.Q Links
E-mail : Sale@dieselpartsworld.com 
 
 
a leading manufacturer and supplier of diesel Nozzle,diesel Plunger,,Pencil nozzle,Head rotor,injector,d.valve...
 
Home>> News
preventive measures (Dieselpartsworld) 2016-04-09

able 1 crank position and spray hole fuel oil measurement stage position correspondence table

May see from the spray hole work process, when the engine stops, besides has 2 or 3 cylinder's PT spray holes is at the fuel oil measurement stage, other PT stage spray hole may the oil discharge, namely the spray hole enter, the output port to be interlinked. Because the PT fuel system uses sets at the fuel tank high, (fuel tank position is higher than the PT pump and the PT spray hole), therefore, once the PT fuel system's cone-way valve 2 closure are lax, will cause in fuel tank's fuel oil through the cone-way valve, the oil discharge oil duct, will pass through again besides is at the measurement stage other PT spray hole to enter the oil oil duct, finally through will be at the fuel oil measurement stage the spray hole to drip into the air cylinder, this has formed the PT spray hole drop oil process, will burn the oil dripping oil oil duct: Fuel oil tank--Cone-way valve--Spray hole oil discharge oil duct--Blow, oil discharge stage spray hole--The spray hole enters the oil oil duct--Measurement stage spray hole--Air cylinder.

3 preventive measures

We had bumped into the breakdown which D85A-18 the bulldozer Commings engine difficulty with starts. Is normal after the inspection engine electric circuit, the oil duct also has the oil, when the starting may see from the cooling fan leaf blade, the crank can transfer the angle is very small, and the reverse moment of force is very big (lets loose button instantaneous). We concluded that the engine has 2 or in 3 cylinders has the fuel oil which infiltrates from the PT spray hole drop, we adopt the reverse extension crank two, then starts successfully, but spouts many fuel oils from the exhaust pipe, had proven our judgment is correct.

Installs a fuel tap when the fuel oil tank, the engine off the fuel tank following fuel tap closure, ceases the drop to infiltrate the fuel oil the source. Hereafter has not broken down this kind of again.

 
Related Products:
MITSUBISHI 6A/90R Diesel Plunger 131152-1420 A138,1311521420

 

 

 

        Home About us Products Catalog News Contact us Sitemap Sitemap(xml)        

Address : 35# , Qixia Road , Gulou District , Fuzhou City , Fujian Province , China
Tel:+86-594-2552566        Fax:+86-594-2552566     PC:350003
WhatsApp : +86 13850261121          E-mail : Sale@dieselpartsworld.com   
Copyright © ChenChen Diesel parts plant All rights reserved